Crusoe

Data Center Construction Safety Manager

Abilene, TX, US

In-personFull time roleMid Level, Senior Level

15 days ago

About the Job

About the Company

Crusoe Logo

Crusoe

San Francisco, CA, USA

251-500

<div class="c-scrollbar__hider" role="presentation" data-qa="slack_kit_scrollbar"> <div class="c-scrollbar__child" role="presentation"> <div class="c-virtual_list__scroll_container" role="list" data-qa="slack_kit_list" aria-label="q (direct message, away)"> <div id="1685645130.304729" class="c-virtual_list__item c-virtual_list__item--initial-activeitem" tabindex="0" role="listitem" aria-setsize="-1" data-qa="virtual-list-item" data-item-key="1685645130.304729"> <div class="c-message_kit__background c-message_kit__background--hovered p-message_pane_message__message c-message_kit__message p-message_pane_message__message--last" role="presentation" data-qa="message_container" data-qa-unprocessed="false" data-qa-placeholder="false"> <div class="c-message_kit__hover c-message_kit__hover--hovered" role="document" aria-roledescription="message" data-qa-hover="true"> <div class="c-message_kit__actions c-message_kit__actions--default"> <div class="c-message_kit__gutter"> <div class="c-message_kit__gutter__right" role="presentation" data-qa="message_content"> <div class="c-message_kit__blocks c-message_kit__blocks--rich_text"> <div class="c-message__message_blocks c-message__message_blocks--rich_text" data-qa="message-text"> <div class="p-block_kit_renderer" data-qa="block-kit-renderer"> <div class="p-block_kit_renderer__block_wrapper p-block_kit_renderer__block_wrapper--first"> <div class="p-rich_text_block" dir="auto"> <div class="p-rich_text_section">Crusoe has pioneered infrastructure that taps into stranded energy &mdash; methane being flared or excess production from clean and renewable sources &mdash; to power the compute resources we need to drive our shared progress and reduce its environmental impact.</div> <div class="p-rich_text_section">&nbsp;</div> <div class="p-rich_text_section">In a few short years, data centers will consume more than 10% of the world&rsquo;s electricity. By powering the Crusoe Cloud&trade; platform and Crusoe Data Centers with clean, low-cost and emissions-reducing energy systems, we are fundamentally changing the economics and environmental impact of computation. We created the Crusoe Cloud&trade; platform and Crusoe Data Centers for users who need flexible, reliable solutions for their most demanding workloads, and for organizations looking to make measurable progress toward environmental goals.</div> <div class="p-rich_text_section"><br />There&rsquo;s never been a greater need to make traditional energy production more efficient, and bring more clean and renewable sources of energy online. Crusoe is a catalyst for doing both. While the complete transition to renewable energy will require new technologies, new infrastructure, and time, we&rsquo;re accelerating the process by creating alternative revenue streams and technical solutions for underutilized renewable and clean energy sources.</div> </div> </div> </div> </div> </div> </div> </div> </div> </div> </div> </div> </div> </div> </div>

Similar Jobs

Granite Industrial Logo

Safety Manager (Federal Construction Projects)

Safety Manager (Federal Construction Projects)

  • Granite Industrial
  • Laredo, TX, US
  • In-person
  • Full time role

Building sustainable infrastructure for a greener, better world.

3 months ago

Environmental Resources Management Logo

Construction Safety Manager (Field Based)

Construction Safety Manager (Field Based)

  • Environmental Resources Management
  • Philadelphia, PA, US
  • In-person
  • Full time role

Strategic consultancy accelerating global sustainability, enabling low-carbon futures and advancing ESG priorities worldwide.

2 months ago

Environmental Resources Management Logo

Lead Construction HSE Manager (Field Based)

Lead Construction HSE Manager (Field Based)

  • Environmental Resources Management
  • Indianapolis, IN, US
  • In-person
  • Full time role

Strategic consultancy accelerating global sustainability, enabling low-carbon futures and advancing ESG priorities worldwide.

About 2 months ago

Environmental Resources Management Logo

Lead Construction HSE Manager (Field Based)

Lead Construction HSE Manager (Field Based)

  • Environmental Resources Management
  • Milwaukee, WI, US
  • In-person
  • Full time role

Strategic consultancy accelerating global sustainability, enabling low-carbon futures and advancing ESG priorities worldwide.

About 2 months ago

Environmental Resources Management Logo

Construction Safety Specialist (Field Based)

Construction Safety Specialist (Field Based)

  • Environmental Resources Management
  • Dallas, TX, US
  • In-person
  • Full time role

Strategic consultancy accelerating global sustainability, enabling low-carbon futures and advancing ESG priorities worldwide.

About 2 months ago

Environmental Resources Management Logo

Construction Safety Specialist (Field Based)

Construction Safety Specialist (Field Based)

  • Environmental Resources Management
  • Indianapolis, IN, US
  • In-person
  • Full time role

Strategic consultancy accelerating global sustainability, enabling low-carbon futures and advancing ESG priorities worldwide.

21 days ago

Argonne National Laboratory Logo

Construction and Contractor Safety Manager

Construction and Contractor Safety Manager

  • Argonne National Laboratory
  • Lemont, IL, US
  • In-person
  • Full time role

Innovative research driving climate solutions and sustainable technologies.

21 days ago

Granite Industrial Logo

Safety Manager - Solar

Safety Manager - Solar

  • Granite Industrial
  • Irving, TX, US
  • In-person
  • Full time role

Building sustainable infrastructure for a greener, better world.

6 days ago

Environmental Resources Management Logo

Construction Safety Specialist (Field Based)

Construction Safety Specialist (Field Based)

  • Environmental Resources Management
  • Philadelphia, PA, US
  • In-person
  • Full time role

Strategic consultancy accelerating global sustainability, enabling low-carbon futures and advancing ESG priorities worldwide.

6 days ago

Environmental Resources Management Logo

Construction Safety Specialist (Field Based)

Construction Safety Specialist (Field Based)

  • Environmental Resources Management
  • Philadelphia, PA, US
  • In-person
  • Full time role

Strategic consultancy accelerating global sustainability, enabling low-carbon futures and advancing ESG priorities worldwide.

6 days ago